Kazakhstan • Engineering • Construction • Solutions

We manage construction systematically: from mobilization to handover

Turkuaz Plan TOO organizes earthworks, monolithic concrete, rebar, facades, finishing, camp and digital site control with clear quantities, proposal and schedule.

4 250Palace of the Republic
5 430Presidential Library
7+service packages
24/7schedule control
Who we are

A practical contractor with an engineering mindset

We are not only an execution crew; we build a site management system: quantities, manpower, machinery, geometry, quality, schedule, photo reports, commercial documents and as-built handover.

TurnkeyEstimate + scheduleDaily controlDocuments and acts
Turkuaz Plan engineering officeMaterials and logistics
Why Turkuaz Plan

Quality, time and transparency inside one site management system.

01

Schedule

Work program, shifts, daily progress and critical path control.

02

Quality

Control of materials, geometry, concrete works, reinforcement and hidden works.

03

Proposal

Clear structure: quantities, resources, payment terms and warranty.

04

Safety

Method statements, briefings, PPE, permits, daily logs and HSE culture.

Service package

Key construction works for industrial, commercial and civil projects

We can take one work package or close the site as a complete package: site preparation, concrete, metal, finishing, facade, temporary camp and site control.

Earthworks
01

Earthworks

Site grading, excavation, transport, backfill, compaction, base preparation, slopes, temporary roads and ready work front.

Monolithic concrete
02

Monolithic concrete

Foundations, slabs, walls, columns, beams, formwork, rebar, concrete pouring, vibration, curing and hidden work acts.

Rebar and metal works
03

Rebar and metal works

A500C/A240 cutting and fixing, cover layer, starter bars, embedded parts, anchors, welding, BBS and stock control.

Camp and mobilization
04

Camp and mobilization

Offices, containers, warehouses, checkpoint, fencing, electricity, water supply, site camp and fast mobilization.

Interior finishing
05

Interior finishing

GKL/Knauf partitions and ceilings, 600×600 suspended ceilings, tile, porcelain, LVT, painting, waterproofing and final cleaning.

Facades and exterior works
06

Facades and exterior works

Facade subsystems, cladding, glass/aluminium elements, insulation, junctions, sealing, joints and drainage.

Digital control and engineering
07

Digital control and engineering

Drone survey, 3D coordination, quantity take-off, schedule, daily reports, photo records and as-built drawings.

Resources

Resources and organization for each specific site

Personnelsite managers, foremen, concrete crews, rebar crews, finishing teams
Machineryexcavators, dump trucks, compaction and lifting equipment
Materialsconcrete, rebar, formwork, facade and finishing systems
Documentsproposal, estimate, schedule, acts, reports and as-built documentation
Camp and mobilization
QA/QC • HSE

Safety and quality — a control system, not a formality

HSEbriefings, PPE, permits and order on site
QA/QCincoming material control, checklists and acts
Logsconcrete, work progress, hidden works and photo archive
Risksearly detection of drawing and quantity conflicts
HSE and quality control
Projects

Project cases and real work directions

Palace of the Republic construction
Astana • Mabatex • 4,250 m³

Palace of the Republic construction

Formwork, rebar, concrete pouring, curing and organization of reinforced concrete works.

Presidential Library
Astana • Mabatex • 5,430 m³

Presidential Library

Monolithic structures, work front preparation, concrete control and execution records.

Industrial infrastructure
Internal access railway tracks

Industrial infrastructure

Earthworks, monolithic structures, quantity take-offs, commercial documentation and schedule.

Work process

From request to handover

01

Request

drawings, quantities, technical task

02

Analysis

measurement, risks, schedule, resources

03

Proposal

price, time, terms, warranty

04

Mobilization

crew, machinery, materials, method statement

05

Production

daily control and reporting

06

Handover

acts, as-built, warranty

Contracting

Cooperation formats

Turnkey package

earthworks + monolith + finishing + facades + mobilization

Single work type

concrete, rebar, tile, GKL, facade, camp

Project support

quantities, schedule, 3D coordination, reporting

Urgent mobilization

crew and machinery for deadline, shift mode

Contact

Ready to discuss your project

Send drawings, quantity schedule or a short technical task; we will prepare a commercial proposal and work schedule.

The form opens WhatsApp with a prepared message. E-mail and phone links are also active.